Shane Fuller
Director | Dual Track Construction
Shane Fuller is the Founder and Director of Dual Track Construction (DTC), bringing over 10 years of hands-on post-tensioning experience across residential, commercial, and multi-storey structural projects.
Over the course of his career, Shane has contributed to the delivery of 100+ post-tensioned slab installations, ranging from reactive residential slabs to complex suspended systems and multi-strand transfer structures.
He spent four years operating as a Construction Manager within the fast-paced, high-pressure Sydney construction industry, delivering structural works for leading builders including Mirvac, Meriton, Buildcorp, Hutchinson Builders, and Trescon.
Working within these environments required strict programme control, disciplined coordination, and zero-compromise execution. Shane led crews, managed sequencing, coordinated with project managers and engineers, and ensured post-tensioning operations were delivered safely, efficiently, and in alignment with demanding construction schedules.
His technical expertise includes:
• Mono strand residential systems
• Suspended slab systems (12.7mm & 15.2mm)
• Multi-strand transfer slabs
• High-rise PT installations (10–50 storeys)
• Epoxy wedge structural modifications
• Dowel & Surlok installation
• Pan void filling and finishing works
In addition to technical execution, Shane’s experience spans:
• Crew leadership and labour structuring
• Critical path and programme management
• Quality assurance and defect prevention
• Implementation of digital documentation systems
Dual Track Construction was established to bring structured leadership, modern systems, and performance-driven delivery to post-tensioning operations.
Under Shane’s direction, DTC operates with a clear focus on protecting programme timelines, maintaining quality standards, and building long-term builder relationships.
Executed with control. Built to last.
My Approach
At Dual Track Construction, post-tensioning is treated as a structural discipline, not a trade task. Our approach operates on two parallel tracks — disciplined on-site execution and continuous coordination behind the scenes. While installation progresses, sequencing, documentation, and programme alignment are actively monitored and refined. This dual-track methodology allows us to move with speed while maintaining control, reducing risk without slowing momentum. The result is structured delivery that protects the programme and strengthens long-term performance.
Our difference:
• Fast, structured site execution
• Digitally managed QA and documentation
• Real-time labour tracking and reporting
• Zero-defect mindset
• Strong programme awareness